Product NewsMore >>
-
05-03 2025
Are Steel Buildings Cheaper Than Concrete Buildings?
In the construction fields of industrial plants, logistics warehouses, commercial exhibition halls, etc., there has always been controversy over which is cheaper, modern steel structure factory building or concrete building. Our modern steel structure factory building has a deadweight of only 1/3-1/2 of that of concrete buildings, which greatly reduces the cost of foundation treatment, and the number of pile foundations of prefabricated building steel structure warehouse will also be reduced. The amount of concrete used in the foundation of our factory steel building is also decreasing, and in soft soil foundation areas, 30%-50% of the foundation reinforcement costs can be saved. -
05-02 2025
Why Do People Choose Steel Structure Warehouse?
When it comes to building warehouses, more and more people's first reaction is Heavy Steel Warehouse. Why? In fact, it is very simple. Heavy steel warehouse is not only strong and durable, but also very fast to build. -
05-01 2025
What Are the Four Types of Steel Structures?
Prefabricated steel workshop has the advantages of high strength, light weight, short construction period, and green environmental protection. According to different design requirements and usage scenarios, steel structures can be subdivided into different types. Among them, portal steel structure, frame steel structure, grid structure and cable membrane structure are widely used in industrial, commercial, civil and public buildings. Portal steel structure is the representative of light steel structure. The steel structure workshop we produce is mainly composed of steel columns and steel beams connected by rigid nodes to form a portal frame system. The roof and wall of prefabricated steel workshop are also often used in combination with lightweight corrugated steel plates or composite plates. Therefore, prefab metal shop buildings have simple structures, light weight, and high degree of industrialization. They are widely used in single-story industrial plants, warehouses, logistics centers, small exhibition halls and supermarkets. Our prefabricated steel structure frame workshop uses a reasonable amount of steel, has a high material utilization rate, and has a low overall cost, which can reduce the project investment cost. In addition, the construction period of prefabricated steel workshop is short and can be put into use quickly. -
04-30 2025
Meituo Built A Warehouse of 80,000 Square Meters In 6 Months
Shenyang Meituo Steel Structure has completed another high-quality project! We are pleased to announce that the 80,000 square meters multi-storey intelligent Prefab Warehouse Building built for Yishang Logistics was successfully completed and put into use in just 6 months. -
04-28 2025
What Is A Steel Structure Warehouse?
When it comes to warehouses, the first thing that comes to mind is traditional brick-concrete buildings, but in fact, more and more companies are choosing to build prefab warehouse building. So what exactly is heavy steel warehouse? -
04-13 2025
The Main Steel Structure Project Was Successfully Completed
On November 25, 2024, the Dalian Rainforest Irrigation Equipment Intelligent Manufacturing Project steel structure building, undertaken by Shenyang Meituo Steel Structure Co., Ltd., was successfully capped.
Company NewsMore >>
-
04-27 2025
Celebrating International Women's Day
In March, when everything is revived and spring is in the air, to celebrate the 114th International Women's Day, our company specially held a celebration with the theme of "Caring for Women, Paying Tribute to Strength". -
04-12 2025
10th Anniversary Celebration
No matter what difficulties we encounter, MEITUO always adheres to its principles, and strictly controls the quality of each engineering project to ensure that Steel Structure Warehouse meets the needs of customers.