• Prefabricated Insulated Steel Factory Building
  • Prefabricated Insulated Steel Factory Building
  • Prefabricated Insulated Steel Factory Building
  • Prefabricated Insulated Steel Factory Building
  • Prefabricated Insulated Steel Factory Building

Prefabricated Insulated Steel Factory Building

Brand MEITUO

Product origin China

1. Modern steel structure factory building can set the unit price from 25 usd/m2 to 75 usd/m2 according to different customer requirements.
2. The service life of prefabricated building steel structure warehouse is more than 50 years.
3. Factory steel building can provide customized design services according to different needs.

Prefabricated Insulated Steel Factory Building

Product introduction of modern steel structure factory building:

Prefabricated building steel structure warehouse is an innovative factory building form that combines the needs of modern industrial buildings with the concept of energy conservation. Meituo uses high-quality steel as the main structural frame, combined with high-performance insulation materials, and produces in a modular prefabricated manner, which allows the factory steel building to be assembled quickly and greatly improves the efficiency of construction. Our factory steel building not only has the high strength and durability that steel structures often have, but also can be insulated, fireproof, and moisture-proof, and can effectively cope with various complex climatic conditions. Therefore, our modern steel structure factory building is suitable for various production and processing plants, warehouses, logistics centers, electronic equipment manufacturing workshops, food workshops, and other places that require strict temperature and humidity control.

Modern Steel Structure Factory Building

Advantages of factory steel building:

1. Modern steel structure factory building adopts factory prefabrication. All steel structures and insulation materials have been cut, formed and numbered before leaving the factory. On-site assembly only needs to be done quickly according to the drawings, which greatly shortens the construction time. Delivery can be completed within a few weeks at the fastest, helping customers to quickly put into production and operation.

2. Prefabricated building steel structure warehouse has good thermal insulation performance. The enclosure structure generally uses materials with low thermal conductivity, which can effectively isolate the outdoor cold and heat exchange, keep warm in winter and cool in summer, effectively reduce air conditioning and heating energy consumption, save daily operating costs, and improve indoor comfort and the working environment of employees.

3. Our factory steel building can provide personalized customization services according to different needs, which not only improves space utilization, but also facilitates future expansion or renovation, and truly realizes the synchronous development of construction and production. In addition, our factory steel building is easy to maintain, and the surface of the steel structure is treated with anti-corrosion and anti-rust, with low maintenance costs.

Prefabricated Building Steel Structure WarehouseFactory Steel Building

Parameters of prefabricated building steel structure warehouse:

StructureMaterialDetails
Main StructureFrame Columns and BeamsQ235/Q355
End Wall ColumnQ235/Q355
H-beam welding(columns and beams)Automatic Submerged Arc Welding
Rust RemovalShot Blasting
Surface ProcessingAlkyd Paint/Epoxy Zinc Rich Paint/Galvanized 
High-Strength BoltGrade 10.9/8.8
Common BoltGrade 4.8
Secondary StructureFlange BraceAngle Steel
Horizontal SupportAngle/Round Steel
Vertical SupportAngle/Round Steel
Tie RodAngle/Round Steel
Tie BarsRound Steel/Casing/Shaped Steel
PurlinGalvanized Z-beam/C-beam
Maintenance SystemRoofing SystemRoofing Materials360°Locking Seam System
/ Locking Screw System / Composite Panel Roofing / Rockwool Maintenance System
Daylighting BandFRP Plate
Gutter (inside/outside)Stainless Steel/Colored Steel Plate
Rain PipePVC Pipe/Color Steel Rainwater Pipe
Wall SystemWall MaterialsLocking Screw System / Composite Panel Wall / Rockwool Maintenance System
Accessories
Sealant, Self-tapping Self-drilling Screws, etc.
Edge FlashingColor Plate/Stainless Steel
OthersVentilatorPowered/Unpowered Axial Flow VentilatorsCustomizable
Ventilation TowerFinished Product
Customizable
DoorElectric Rolling Door/Sliding Door/fireproof doorCustomizable
WindowAluminum Alloy/plastic Steel Window/Fireproof WindowCustomizable


Installation process of modern steel structure factory building:

Before the project starts, we will fully communicate with the customer to confirm the final design of factory steel building, and complete the prefabrication of all steel components and insulation panels according to the building requirements. In the steel processing stage of factory steel building, all beams, columns, purlins and connectors are cut, drilled, welded according to standard specifications, and anti-corrosion sprayed. At the same time, the insulation panels are also prefabricated according to the on-site dimensions. Subsequently, all materials will be packaged according to classification numbers to ensure integrity and efficiency during transportation. When the on-site foundation construction is completed, the installation stage of modern steel structure factory building will officially begin. The installation team will start with the main frame according to the drawings and numbering sequence, and gradually hoist and fix the steel columns and steel beams to ensure the stability and accuracy of the overall structure. Then install the roof purlins and wall purlins to prepare for the subsequent board laying. Then, start installing the insulation panels on the roof and walls of prefabricated building steel structure warehouse, and arrange supporting facilities such as doors and windows, ventilation systems, and skylights reasonably. During the entire construction process of the factory steel building, professionals will conduct real-time measurements and quality inspections to ensure that the building's verticality, flatness, wind resistance, etc. Meet the design standards.

Modern Steel Structure Factory Building

Why choose us?

We have advanced production equipment and rich experience. All steel structures and insulation systems of factory steel building are uniformly produced by the factory. We strictly control every detail to ensure that the products meet international standards. We can also provide full-process customization services for factory steel building. According to the different needs of customers, we can flexibly design the size, layout, floor height, number and location of doors and windows, and internal functional area division. Our factory steel building is not only cost-controlled in the early stage of construction, but also has good thermal insulation performance in the later use process, which greatly reduces the energy consumption of cooling and heating, and is easy to maintain and has a long life.

Prefabricated Building Steel Structure Warehouse

About us:

Meituo has an experienced professional team, adopts internationally advanced equipment and production technology, has multiple intelligent steel structure production lines, and has built an efficient and complete modern production system. And Meituo has served more than 150 countries. The product coverage is wide.

Factory Steel Building

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right